Xingyuan Industry Group CO.,LTD Company Logo Xingyuan Industry Group CO.,LTD
5 1

Biomass Power Plant Converting Forest Waste To Energy

Contact Now* Send an Inquiry to this supplier.
or
Start Order * Name your price

Contact us

Xingyuan Industry Group CO.,LTD
[China]

Address
Nanlvcun industry zone, Shijiazhuang, Hebei, China Shijiazhuang Hebei
Phone
86-311-83335033
Contact name
richi.yao

Quick Information

  • Place of Origin: China
  • :

Description

Biomass Power Plant Converting Forest Waste to Energy

G---gas, syngas for electricity

C---charcoal, wood charcoal or shell charcoal.

E---electricity from 200-nM KW, as design

L---- liquid , wood tar oil and wood vinegar .

BIOMASS GASIFIER FOR THERMAL AND POWER APPLICATIONS

Xingyuan New Technolo Biomass Power Plant  

Biomass gasification is a process of converting solid biomass fuel into a gaseous combustible gas (called producer gas) through a sequence of thermo-chemical reactions. The gas is a low-heating value fuel, with a calorific value between 1000- 1200 kcal/Nm3 (kilo calorie per normal cubic metre). Almost 2.5-3.0 Nm3 of gas can be obtained through gasification of about 1 kg of air-dried biomass. Since the 1980's the research in biomass gasification has significantly increased in developing countries, as they aim to achieve energy security.

https://www.xygrup.cn/products/

Xingyuan independently began research work in gasifier technology in the mid-2010. Since, the gasifier technology has been customized for a range of direct-heat application and tested successfully in the field. Silk processing, large-cardamom drying and gasifier-based crematoria are a few examples of the applications worked on at TERI. This technology is slowly replacing both traditional biomass use and gas-powered systems, as it provides an excellent de-centralized source of energy at an affordable cost. Apart from rural households, biomass fuels are the main source of energy to a large number of small, rural and cottage industries.

More informotion click here .


Price

  • Delivery Port : Tianjin Port

Packaging & Delivery

  • Delivery Lead Time : 20-60days after received the deposite
  • Supply Ability : 1-5set per month

Product Image

  • Biomass Power Plant Converting Forest Waste To Energy image

Other products from this supplier

Send an Inquiry to this supplier

Send an Inquiry to this supplier
* From
  To richi.yao
Xingyuan Industry Group CO.,LTD
* Buying Product
- Please enter your specific buying item.
e.g. 42 inch LCD TV, leather executive chair
Category : Other Manufacturing & Processing Machinery
* Message

Use English only Max. 2000 characters. (Min. 20)

Send
EC21.com does not guarantee the validity of product information or the credentials of sellers.
Chat Online with$Xingyuan Industry Group CO.,LTD.
Click the "S Chat" Icon on the right-hand to contact Xingyuan Industry Group CO.,LTD.
Note: Please ensure you have installed Skype program in your computer.
           If you don't have yet, click here to download Skype.

Close Window